This new dedicated state-of- the-art facility replaces the ageing facility in buidling 172 (~30 years old). It was designed and built to house all CERN-activities in this domain, including material tests.
- Neutron/gamma simultaneous calibration
- Low neutron scattering
- Irradiators and benches remotely controlled
- X-ray generator